This project required the asbestos removal of lagged pipes, debris and soil from under the floors of part of a grade 2 listed building in Chichester, Sussex
The boiler needed replacement but before a plumber could start work, the Asbestos Insulation Board (AIB) was removed by us and the room surfaces made safe.